Check the system and parts
Share furniture models, quantities, drawings, and manufacturer instructions. Missing fixings or incompatible components are identified before an assembly date is confirmed.
We deliver, assemble, and place commercial furniture for workplace moves and office reconfigurations.
Service availability depends on the location, route, dates, and handling requirements. Storage, installation, specialist work, and remote or northern transport are confirmed in your proposal.
Scope a furniture installation ↗
We review your furniture systems, quantities, and floor plan, then deliver, assemble, and position the agreed pieces. We check the completed layout with you and record any outstanding items in the final walkthrough.
Electrical connections, wall fixing, structural alterations, and manufacturer-specific work require a separately agreed scope with qualified specialists. Product compatibility, missing parts, and warranty requirements are assessed before assembly.
Share furniture models, quantities, drawings, and manufacturer instructions. Missing fixings or incompatible components are identified before an assembly date is confirmed.
Group components by destination area and leave a workable assembly space. The agreed desks, tables, storage, and seating are assembled and positioned to the layout.
Check furniture placement and record outstanding components or adjustments. Separately scoped electrical, structural, or specialist fixing work remains with the appointed trades.

Assemble desks and fit compatible screens to the agreed floor plan. Confirm furniture systems, components and installation requirements before booking.

Assembly and placement of conference tables and seating, with a final check of connections and alignment.

Assemble and position reception furniture to suit the approved entrance layout, with components and access checked before installation.

Reconfigure compatible panels and workstations to the approved layout.

Position lounge seating and tables for the agreed shared-space layout.
Provide product details, quantities, condition, and the proposed floor plan. Reuse depends on fit, available parts, manufacturer requirements, and the installation scope. Technical or building works are reviewed separately.
Identify known shortages when sharing the furniture schedule. We can record affected workstations and discuss the assembly sequence, but compatible replacement parts and manufacturer requirements must be resolved before those pieces can be completed.
Select the installation municipality and prepare the furniture schedule. Site access, assembly space, and the approved layout shape the installation sequence.
Share your origin and destination cities, preferred dates, and the items being moved. Include floors, elevators, loading docks, access restrictions, and any packing or storage needs. An approximate inventory is enough to start the conversation.
Müve reviews your project, clarifies any missing details with you, and confirms availability. The proposal sets out the scope, route, responsibilities, and included services before you book.
Yes. You can enquire about commercial storage, furniture installation, or office decommissioning. Enter the project address in both location fields when the work takes place at one site. Availability and the scope of work will be confirmed.
Tell us the furniture systems, quantities, delivery status, and target installation date. Note whether you need disassembly, reassembly, new furniture assembly, or a combination.

Product details, available parts, and the approved layout help us identify assembly dependencies.